LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 1992 >> Explorer 4D Utility, RWD, Automatic >> Repair and Diagnosis (Single Page) >> Drivelines & Axles >> Driveshaft & Universal Joints >> Drive Shaft >> Overhaul >> Double CARDAN Universal Joints >> Installation (1-Piece Shaft - Rear)

Installation (1-Piece Shaft - Rear)

  1. Clean yoke. Inspect machined surface for scratches, nicks, or burrs. Check for arrows on slip joint and drive shaft to aid in alignment. Lubricate yoke splines and install into transmission output shaft.
  2. Connect drive shaft to rear companion flange. On all models except E350, install "U" bolts and tighten to 15 ft. lbs. (20 N.m). On E350, connect drive shaft flange to rear axle flange, and tighten bolts to 70-95 ft. lbs. (95-129 N.m).