Mechanical - Hydraulic: Drum: Remove & Replace
WARNING: This page is about the Cutaway 5.8 H, which is a different variant/trim than selected.
Includes: Repack Wheel Bearings (where applicable).
DOES NOT include refinishing.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Rear,Full Floating Rear Axle,Drum,Inboard Mounted Drum,Both | 2.0 | B | ||
| Rear,Full Floating Rear Axle,Drum,Inboard Mounted Drum,One Side | 1.1 | B | ||
| Rear,Full Floating Rear Axle,Drum,Outboard Mounted Drum,Both | 0.5 | B | ||
| Rear,Full Floating Rear Axle,Drum,Outboard Mounted Drum,One Side | 0.3 | B | ||
| Rear,Full Floating Rear Axle,Hub & Drum,Both | 1.4 | B | ||
| Rear,Full Floating Rear Axle,Hub & Drum,One Side | 0.8 | B | ||
| Rear,Semi-Floating Rear Axle,Both | 0.5 | B | ||
| Rear,Semi-Floating Rear Axle,One Side | 0.3 | B | ||
| Combination Procedure: BRAKE DRUM (REMOVED): Refinish: DOES NOT include grind hot spots. | ||||
| Each Additional | 0.2 | B | ||
| One | 0.3 | B | ||