Electronic Instrument Cluster (EIC): Installation
- Insert top of EIC under crash pad, leaving bottom of cluster out. Plug in EIC connectors "A" and "B". Seat EIC into mounting position and install 4 retaining screws. Reconnect negative battery cable. Check EIC operation.
- Perform TEST TB (Prove Out Test) by turning ignition switch to RUN position and observing cluster display operation. See TEST TB under SYSTEM TESTS. Ensure EIC operates normally. Install autolamp switch. Install cluster finish trim panel. Install headlight switch shaft.