Worm Bearing Preload & MESHLOAD
- Remove steering gear from vehicle. See REMOVAL & INSTALLATION . Tighten the sector cover bolts to 40 ft. lbs. (53 N.m). Loosen preload adjuster locknut and screw.
- Tighten worm bearing adjuster until all end play has been removed. Lubricate wormshaft seal with a drop of automatic transmission fluid. Turn worm shaft carefully to the right stop.
- Using an INCH lb. torque wrench, measure the torque required to rotate worm shaft to the left, in a constant motion, for approximately 1 1/2 turns.
- Turn adjuster nut to obtain a preload of 5-6 INCH lbs. (56-68 N.cm) on Bronco II and Ranger or 7-9 INCH lbs. (79-102 N.cm) on Pickup and Van. Tighten adjuster nut. Rotate the wormshaft to the center position.
- Using an INCH lbs. torque wrench, measure the highest reading while the wormshaft is turned approximately 90° either way across center.
- If the highest reading is not within 9-10 INCH lbs. (102-113 N.cm) on Bronco II and Ranger or 12-14 INCH lbs. on Pickup and Van, turn sector shaft adjusting screw as required.
- Meshload must be at least 4 INCH lbs. (45 N.cm) over the preload. Hold the sector shaft adjusting screw and torque the locknut to 25 ft. lbs. (34 N.m).