LEMON Manuals: Even more car manuals for everyone
Home >> Fiat >> 2018 >> 500 Lounge, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 6 (Electric Powertrain System - 500 - Electric) >> Power Electronics Cooling System >> Radiator, Power Electronics Coolant >> Installation

Radiator, Power Electronics Coolant: Installation

WARNING: This page is about a different variant/trim than selected.
WARNING:

When performing any repairs that involve contact with high voltage components or systems, the technician performing repairs on the vehicle must verify that the system remains powered down during high voltage repairs.

  • This must be done by removing the service disconnect.
  • The high voltage power down procedure must also be performed to ensure that the vehicle is properly powered down.
  • The technician must know the whereabouts of the service disconnect throughout the repair.
  • The technician must ensure that no one reconnects the service disconnect while service is being performed.
  • The technician must recheck that the service disconnect has not been reinstalled in cases where the vehicle was unattended.
GC0157828Courtesy of CHRYSLER GROUP, LLC
  1. Install the cooling fan to the power electronics coolant radiator.
  2. Install the two cooling fan assembly screws (1), and tighten to 8 Nm (71 in. lbs.).
    GC0157667Courtesy of CHRYSLER GROUP, LLC
  3. Install the two lower power electronics coolant radiator brackets (2) on the radiator.
  4. Position the power electronics coolant radiator, and install the two lower power electronics coolant radiator bracket screws (1). Tighten the screws to 8 Nm (71 in. lbs.).
    GC0152367Courtesy of CHRYSLER GROUP, LLC
  5. Connect the cooling fan assembly electrical connector (3).
  6. Connect the two power electronics coolant radiator hoses.
  7. Install the A/C condenser. Refer to CONDENSER, A/C, INSTALLATION .
  8. Connect the negative 12-volt battery cable.
  9. Power up the high-voltage system. Refer to HIGH-VOLTAGE POWER UP .
  10. Fill the power electronics cooling system. Refer to HIGH-VOLTAGE BATTERY COOLING AND HEATING SYSTEM, STANDARD PROCEDURE .
  11. Install the electric motor trim cover. Refer to COVER, BEAUTY, INSTALLATION .