LEMON Manuals: Even more car manuals for everyone
Home >> Fiat >> 2018 >> 500 Lounge, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 17 (Front Suspension & Wheel Alignment - 500 - Electric) >> Front >> Stabilizer Bar, Front >> Installation

Stabilizer Bar, Front: Installation

WARNING: This page is about a different variant/trim than selected.
NOTE:

Gas engine shown in the illustration, electric vehicle (BEV) similar. 

NOTE:

While raising the crossmember, pay close attention to the steering rack pinion shaft so that it properly fits up and into the dash boot between the rack and body.

GC0153597Courtesy of CHRYSLER GROUP, LLC
  1. Install the stabilizer bar (1), link ends first, over top of the crossmember. Curve the ends of the bar over the steering gear.
    GC0152758Courtesy of CHRYSLER GROUP, LLC
  2. Slowly raise the crossmember into mounted position using the transmission jack, matching the crossmember to the marked locations on the body made during removal. Ensure that the steering rack pinion shaft is aligned with the dash panel boot opening.
  3. Install steering rack mounting bolts and tighten to 75 N.m (55 ft. lbs.).
  4. Install the four rear mounting bolts (2) securing the front crossmember to the body. Do not fully tighten the crossmember mounting bolts at this time.
  5. Install two front mounting bolts (1, 3) securing the front crossmember to the body. Do not fully tighten the bolts at this time.
  6. Remove the transmission jack.
    GC0153595Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Stabilizer bar cushion retainer bolts have fastener adhesive on them and are required to be replaced with new bolts every time they are removed.

  7. Install four NEW  bolts securing the stabilizer bushing retainers to the crossmember. Tighten the right side stabilizer bar cushion retainer bolts (1) to 25 N.m (18 ft. lbs.).
    GC0153596Courtesy of CHRYSLER GROUP, LLC
  8. Tighten the left side stabilizer bar cushion retaining bolts (1) to 25 N.m (18 ft. lbs.).
    GC0152449Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Ensure that the front support beams are inserted into the crossmember front clevis prior to installing the tunnel support brace bolts in the next step.

  9. Install tunnel support brace (2). Install mounting bolts (1) and tighten to 100 N.m (74 ft. lbs.).
  10. Install rear engine mount.
    GC0152735Courtesy of CHRYSLER GROUP, LLC
  11. Attach the upper stabilizer link at the strut on each side of the vehicle. While holding the stabilizer stud stationary, install and tighten each nut (1) to 50 N.m (37 ft. lbs.).
  12. Attach the stabilizer bar link at each end of the stabilizer bar. At each link, install and tighten the nut while holding the stabilizer bar link lower stud stationary. Tighten the nuts to 50 N.m (37 ft. lbs.).
    GC0152558Courtesy of CHRYSLER GROUP, LLC
  13. Install outer tie rod end (5) to knuckle (3). Install nut (4) on tie rod stud and tighten to 40 N.m (30 ft. lbs.).
  14. Install lower ball joint stud (1) to knuckle (3) and install retaining nut (2). Tighten nut to 65 N.m (48 ft. lbs.).
  15. If equipped, install the engine belly pan.
    GC0152555Courtesy of CHRYSLER GROUP, LLC
  16. Install tire and wheel assembly Refer to INSTALLATION .
  17. Lower the vehicle.
    GC0084367Courtesy of CHRYSLER GROUP, LLC
  18. Verify the front wheels of vehicle are in the STRAIGHT-AHEAD position.
  19. Install intermediate shaft (2) to steering rack pinion shaft. Install a NEW  pinch bolt and tighten to 55 N.m (40 ft. lbs.).
  20. Perform wheel alignment as necessary. Refer to STANDARD PROCEDURE .
    GC0152758Courtesy of CHRYSLER GROUP, LLC
  21. After the alignment has been performed, tighten four rear mounting bolts (2) to 165 N.m (122 ft. lbs.) and tighten two front mounting bolts (1, 3) to 125 N.m (92 ft. lbs.).