LEMON Manuals: Even more car manuals for everyone
Home >> Fiat >> 2018 >> 500 Lounge, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 16 (Antilock Brake System (Abs) (Service Information) 500 - Electric) >> Hydraulic/Mechanical >> Integrated Control Unit (ICU) >> Installation

Integrated Control Unit (ICU): Installation

WARNING: This page is about a different variant/trim than selected.

The hardware to secure the PDC bracket to the cradle MUST BE REPLACED when servicing. 

  1. Install the ABM onto the mount tabs.
  2. Tighten the nuts mount isolator nuts to 9 N.m (80 in. lbs.).
  3. Connect the controller connector.
    GC0157779Courtesy of CHRYSLER GROUP, LLC
  4. Install the brake lines (1, 2, 3, 4, 6, 7) to the ABM (2) and tighten to 18 N.m (13 ft. lbs.).
  5. Remove the hose pinch tool from the supply hose.
    GC0157740Courtesy of CHRYSLER GROUP, LLC
  6. Install the PDC bracket (2).
  7. Position the bonding wire over the left rear stud and tighten the nut to 9 N.m (80 in. lbs.).
  8. Install the NEW  PDC bracket nuts (1). Tighten the nuts to 18 N.m (13 ft. lbs.).
    GC0157703Courtesy of CHRYSLER GROUP, LLC
  9. Insert the harness retainer (1) into the bracket (2).
    GC0157729Courtesy of CHRYSLER GROUP, LLC
  10. Install the PDC to the bracket. Install the nuts and tighten to 9 N.m (80 in. lbs.).
    GC0157724Courtesy of CHRYSLER GROUP, LLC
  11. Plug in the PDC connectors (1).
    GC0157688Courtesy of CHRYSLER GROUP, LLC
  12. Install the PDC onto the bracket.
    GC0157870Courtesy of CHRYSLER GROUP, LLC
  13. Install a NEW  gasket to the suction line fitting (1).
  14. Connect the suction line (1) to the HV battery chiller block (2). Tighten the nut to 11 Nm (8 ft. lbs.).
    GC0157826Courtesy of CHRYSLER GROUP, LLC
  15. Install a NEW  seal to the suction line fitting (1). Install the line to the evaporator block (2) and tighten the nut to 11 Nm (8 ft. lbs.).
    GC0157761Courtesy of CHRYSLER GROUP, LLC
  16. Install the bolt (2) that secures the suction line retainer (1) to the power distribution center and tighten to 9 N.m (80 in. lbs.).
    GC0157607Courtesy of CHRYSLER GROUP, LLC
  17. Connect the under-hood fusebox connectors (1, 2).
    GC0157694Courtesy of CHRYSLER GROUP, LLC
  18. Connect the Intelligent Battery Sensor (IBS) two wire connector (1).
  19. Install the battery tray. Refer to TRAY, BATTERY, INSTALLATION .
  20. Install the battery. Refer to BATTERY, INSTALLATION .
  21. Recharge the air-condition system. Refer to STANDARD PROCEDURE .
  22. Fill the brake fluid reservoir.
    GC0157771Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Do not use any lubricants on the rubber grommets.

  23. Inspect the rubber grommets (1) for secure fit in the cover.
  24. Position the beauty cover over the four mounting posts.
    GC0157873Courtesy of CHRYSLER GROUP, LLC
  25. Using palm pressure, push down onto the cover at the four points (1) above the posts until fully seated.
  26. Pinch the power electronics coolant reservoir return hose and insert into the notch.
  27. Power up the vehicle. Refer to HIGH-VOLTAGE POWER UP .
  28. Perform the Repair Bleed Verification routine.