LEMON Manuals: Even more car manuals for everyone
Home >> Fiat >> 2018 >> 500 Lounge, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 14 (Heating & Air Conditioning (Service Information) 500 - Electric) >> Plumbing >> Line, A/C Discharge >> Installation >> A/C Discharge Line Installation

A/C Discharge Line Installation

WARNING: This page is about a different variant/trim than selected.
CAUTION:

Be certain to adjust the refrigerant oil level when servicing the A/C refrigerant system. Failure to properly adjust the refrigerant oil level will prevent the A/C system from operating as designed and can cause serious A/C compressor damage.

NOTE:

When replacing multiple A/C system components, see the Refrigerant Oil Capacities chart to determine how much oil should be added to the refrigerant system. Refer to STANDARD PROCEDURE .

NOTE:

The Fiat 500e A/C system uses a UNIQUE POE OIL  in high-voltage compression because it is non-conductive.

NOTE:

Replacement of the refrigerant line seals is required anytime a refrigerant line is disconnected. Failure to replace the seals may result in a refrigerant system leak.

  1. Position the A/C discharge line into the engine compartment.
    GC0157861Courtesy of CHRYSLER GROUP, LLC
  2. Install the RH upper A/C discharge line bracket bolt (1).
    GC0157692Courtesy of CHRYSLER GROUP, LLC
  3. Install the LH lower A/C discharge line bracket bolt (1).
    GC0157715Courtesy of CHRYSLER GROUP, LLC
  4. Remove the tape or plug from the opened discharge line fitting and the compressor port.
  5. Lubricate a new seal with clean refrigerant oil and install it onto the discharge line fitting. Use only the specified seal as it is made of a special material for the R-134a system. Use only refrigerant oil of the type recommended for this vehicle.
  6. Engage the A/C discharge line to the Electric A/C compressor (EAC).
  7. Install the retaining nut (1) and securely tighten.
  8. Install the cooling module. Refer to Cooling Module Installation.
  9. Connect the negative battery cable and power up the high-voltage system. Refer to 12 VOLT POWER UP .
  10. Evacuate the refrigerant system. Refer to STANDARD PROCEDURE .
  11. Adjust the refrigerant oil level. Refer to STANDARD PROCEDURE .
  12. Charge the refrigerant system. Refer to STANDARD PROCEDURE .
  13. Install the electric motor trim cover.