Isolation Measurement Of 3 Phase Wiring Harness
WARNING: This page is about a different variant/trim than selected.
WARNING:
On vehicles equipped with the high voltage system, you must thoroughly read and follow all High Voltage Safety procedures. In addition, before performing any diagnostic or service procedure near a high voltage component, you must perform the High Voltage Power Down. Failure to follow these instructions may result in possible serious or fatal injury.
Refer to HIGH-VOLTAGE POWER DOWN PROCEDURE to perform the High Voltage Power Down procedure.
NOTE:
Any time the Power Inverter Module (PIM) cover is removed, it MUST BE REPLACED due to a non reusable seal.
- Disconnect 3-Phase Connectors from e-Motor and PIM.
- Connect measuring adapter on the e-Motor side of the cable.
- Using a qualified isolation tester take 3 measurements: measure isolation resistance of U/V/W to shielding.
- Wait for 10 seconds between measurements.
- If measured values are less than 50M?, then replace 3 phase Wiring Harness.