Manifold, Intake: Removal
- Perform the fuel pressure release procedure. Refer to FUEL SYSTEM PRESSURE RELEASE .
- Remove the engine cover assembly.
- Recover the refrigerant from the refrigerant system. Refer to PLUMBING, STANDARD PROCEDURE .
- Disconnect the PCV hose from the intake manifold.
- Disconnect the vent hose from the cylinder head cover.
- Remove three bolts and remove the oil separator housing from the cylinder head cover.
- Disconnect and remove the battery. Refer to BATTERY, REMOVAL .
- Unlock and disconnect the Powertrain Control Module (PCM) harness connectors (1 and 2).
- Disengage two engine wire harness retainers (4) from the battery tray (3).
- Disengage the engine wire harness connector (2) from the battery tray (3) and reposition the wire harness.
- Remove the nut (5) and two bolts (1) securing battery tray.
- Remove the battery tray with the PCM (2) attached.
- Unlock and disconnect the harness connector (1) from the Electronic Throttle Control (ETC).
- Disconnect the EVAP purge hose (4) from the retaining clip (3).
- Loosen the clamp (2) securing the charge air cooler outlet hose to throttle body.
- Remove two bolts (2), one nut (3) and reposition the oil separator housing bracket (1).
- Disengage the EVAP purge hose (4) from the retaining clip (2) and remove the hose from the charge air cooler outlet hose (5).
- Disconnect the boost pressure sensor wire harness connector (1).
- Remove the bolts (3) from the charge air cooler outlet hose (5).
- Disconnect the charge air cooler outlet hose (5) from the charge air outlet manifold and remove the hose from the vehicle.
- Open hose retainer (2) and disconnect the fuel vapor purge hose.
- Disconnect the fuel line (1) from the fuel rail.
- Disconnect the vacuum line from the vacuum pump (1).
- Unlock and disconnect the IAT/MAP sensor harness connector (1).
- Disengage and reposition the purge flow control solenoid (1) from the bracket (4).
- Remove two nuts (1), bolt (7), and the bracket (2).
- Disengage the retainers (5) from the support bracket (4).
- Remove the nut (3), bolt (6), and the support bracket (4).
- Remove the belly pan. Refer to BELLY PAN, REMOVAL .
- Drain the cooling system. Refer to STANDARD PROCEDURE
.
- Remove four bolts (1) and the tunnel support brace (2).
- Remove both front wheels and tires.
- Remove two bolts (4) and the right vertical brace (5).
- Remove two screws (2) from the front wheelhouse splash shield.
- Remove three screws (1) and the frame splash shield (3).
- Remove the accessory drive belt. Refer to BELT, SERPENTINE, REMOVAL .
- Remove the A/C compressor. Refer to COMPRESSOR, A/C, REMOVAL
.
- Disconnect the heater core outlet hose (3) and inlet hose (4) from the heater core.
- Open the two wire harness retainers (1) and reposition the wire harness.
- Remove the bolt (2) securing the hose retainer (1) to the intake manifold.
- Remove the seven intake manifold flange bolts (1) and remove the intake manifold from the vehicle.
- Remove and discard the four intake manifold seals (1).
- Cover the open intake ports to prevent debris from entering the engine.
- If required, remove the following components from the intake manifold:
- Throttle body. Refer to THROTTLE BODY, REMOVAL .
- Fuel rail. Refer to RAIL, FUEL, REMOVAL .
- Fuel injector(s). Refer to INJECTOR(S), FUEL, REMOVAL .
- IAT/MAP sensor (Refer to SENSOR, MANIFOLD AIR PRESSURE (MAP) .