Charging (Service Information) - 500: Generator: Installation
- Carefully position the generator (3) up to the engine block and loosely install the bottom two generator mounting bolts (2).
- Install the top generator mounting bolts (1).
- Tighten the generator mounting bolts to 25 Nm (18 lbf-ft).
- Install the generator B+ cable on the generator stud. Tighten nut to 4 Nm (36 lbf-in).
- Connect the field generator harness connector.
- Install the intermediate shaft and right side axle shaft
Refer to INSTALLATION .
- Install the belly pan (1)
Refer to BELLY PAN, INSTALLATION .
- Lower the vehicle.
- Install the accessory drive belt (4)
Refer to BELT, SERPENTINE, INSTALLATION .
- Connect the negative battery cable and tighten nut to 5 Nm (45 lbf-in).
- Start the engine and verify the generator is operating properly.