Integrated Control Unit (ICU): Installation: Installation
WARNING: This page is about a different variant/trim than selected.
The hardware to secure the PDC bracket to the cradle MUST BE REPLACED when servicing.
- Install the ABM onto the mount tabs.
- Tighten the nuts mount isolator nuts to 9 N.m (80 in. lbs.).
- Connect the controller connector.
- Install the brake lines (1, 2, 3, 4, 6, 7) to the ABM (2) and tighten to 18 N.m (13 ft. lbs.).
- Remove the hose pinch tool from the supply hose.
- Install the PDC bracket (2).
- Position the bonding wire over the left rear stud and tighten the nut to 9 N.m (80 in. lbs.).
- Install the NEW PDC bracket nuts (1). Tighten the nuts to 18 N.m (13 ft. lbs.).
- Insert the harness retainer (1) into the bracket (2).
- Install the PDC to the bracket. Install the nuts and tighten to 9 N.m (80 in. lbs.).
- Plug in the PDC connectors (1).
- Install the PDC onto the bracket.
- Install a NEW gasket to the suction line fitting (1).
- Connect the suction line (1) to the HV battery chiller block (2). Tighten the nut to 11 Nm (8 ft. lbs.).
- Install a NEW seal to the suction line fitting (1). Install the line to the evaporator block (2) and tighten the nut to 11 Nm (8 ft. lbs.).
- Install the bolt (2) that secures the suction line retainer (1) to the power distribution center and tighten to 9 N.m (80 in. lbs.).
- Connect the under-hood fusebox connectors (1, 2).
- Connect the Intelligent Battery Sensor (IBS) two wire connector (1).
- Install the battery tray. Refer to TRAY, BATTERY, INSTALLATION .
- Install the battery. Refer to BATTERY, INSTALLATION .
- Recharge the air-condition system. Refer to STANDARD PROCEDURE .
- Fill the brake fluid reservoir.
NOTE:
Do not use any lubricants on the rubber grommets.
- Inspect the rubber grommets (1) for secure fit in the cover.
- Position the beauty cover over the four mounting posts.
- Using palm pressure, push down onto the cover at the four points (1) above the posts until fully seated.
- Pinch the power electronics coolant reservoir return hose and insert into the notch.
- Power up the vehicle. Refer to ELECTRIC VEHICLE CONTROL SYSTEM, STANDARD PROCEDURE .
- Perform the Repair Bleed Verification routine.