Diagnostic Test
WARNING: This page is about a different car, the 2015 Fiat 500. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK BATTERY SYSTEM VOLTAGE
- Inspect and test the Battery with the Midtronics Battery Tester or equivalent for a shorted or dead cell before continuing with this test.NOTE:
This DTC can set if excessive high or low battery system voltage has occurred during programming.
Did the battery pass testing?
Yes
- Go To 2
No
- Replace the Battery in accordance with the Service Information.
Refer to BATTERY, REMOVALBATTERY, REMOVAL .
- With the scan tool, program the Secret Key information into the PCM using the MODULE PROGRAMMING procedure. Refer to PROGRAM THE PCM (POWERTRAIN CONTROL MODULE) .
- Inspect and test the Battery with the Midtronics Battery Tester or equivalent for a shorted or dead cell before continuing with this test.
- NO COMMUNICATION WITH BODY CONTROL MODULE (BCM)
- With the scan tool, attempt to communicate with the BCM.
Can the scan tool communicate with the BCM?
Yes
- Go To 3
No
- Refer to NO RESPONSE FROM BCM (BODY CONTROL MODULE) and perform the No Response from BCM diagnostic procedure.
- With the scan tool, attempt to communicate with the BCM.
- PROGRAMMING SECRET KEY INTO THE PCM
- Turn the ignition on.
- With the scan tool, erase DTCs.
- Cycle the ignition key two times.NOTE:
The secret key code should transfer automatically when the ignition is cycled on.
- Attempt to start the engine.NOTE:
If the engine will not start, crank the engine over for 15 seconds. Crank at least two (2) times with the ignition switch returning to the off position each time.
- With the scan tool, read DTCs.
Does the DTC return?
Yes
- Replace and program the Powertrain Control Module in accordance with the Service Information. Refer to MODULE, POWERTRAIN CONTROL, REMOVAL and PROGRAM THE PCM (POWERTRAIN CONTROL MODULE) .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST, 16V .
No
- The Secret Key information has been successfully programmed into the PCM. Test is complete.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST, 16V .