Automatic Temperature Control (ATC)
Courtesy of CHRYSLER GROUP, LLC
- Position the A/C heater control (1) to the instrument panel and connect the HVAC wire harness connector (2).
Courtesy of CHRYSLER GROUP, LLC
- Install the instrument panel cover. Refer to
COVER, INSTRUMENT PANEL, INSTALLATION
.
- Install the four screws (2, 3, 5 and 6) that secure the A/C heater control (1) to the instrument panel cover (4). Tighten the screws securely.
- Install the instrument panel center bezel. Refer to
BEZEL, INSTRUMENT PANEL, CENTER, INSTALLATION
.
Courtesy of CHRYSLER GROUP, LLC
- Position the control panel (3) to the instrument panel and connect the HVAC wire harness connector (2) to the accessory switch pod (1).
Courtesy of CHRYSLER GROUP, LLC
- Position the control panel (1) to the instrument panel (2) and engage the retaining tabs that secure the panel to the A/C heater control. Make sure the retaining tabs are fully engaged.
- Reconnect the negative battery cable.
- Initiate the Actuator Calibration function using a scan tool. Refer to STANDARD PROCEDURE
.