LEMON Manuals: Even more car manuals for everyone
Home >> Fiat >> 2015 >> 500 E >> Repair and Diagnosis >> Accessories & Equipment >> Heated Glass/Defoggers >> Heated Glass (Service Information) 500 - Except Electric >> Relay, Defogger >> Installation >> Installation

Relay, Defogger: Installation: Installation

Fig 1: Power Distribution Center (PDC) & EBL Relay
GC0152521Courtesy of CHRYSLER GROUP, LLC
  1. Position the EBL relay (2) into the proper receptacle of the Power Distribution Center (PDC) (1).
  2. Align the EBL relay terminals with the terminal cavities in the PDC receptacle and push down firmly on the relay until the terminals are fully seated.
  3. Install the cover onto the PDC. Tighten the retaining screw securely.
  4. Reconnect the negative battery cable.