Cylinder Head: Installation
- Install cylinder head using NEW gasket. Ensure identification mark at timing belt end of gasket faces upward. DO NOT apply sealant to head gasket. Install and tighten cylinder head bolts (in 5 steps) to specification in proper sequence. See Figure. See TORQUE SPECIFICATIONS .
- To complete installation, reverse removal procedure. Apply sealant to contact surfaces of semi-circular packing. Lubricate "O" ring on fuel line before installing fuel line in fuel delivery pipe. Adjust all control cables. Fill cooling system.