LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2018 >> Charger SXT Plus >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 6 (Nag1 Automatic Transmission (Service Information)) >> Operation >> Shift Groups/ Shift Sequence >> Shift Phase - 2-1 Shift Phase 2

Shift Phase - 2-1 Shift Phase 2

WARNING: This page is about a different variant/trim than selected.
GC0081163Courtesy of CHRYSLER GROUP, LLC
1 - 1-2/4-5 SHIFT SOLENOID
5 - 1-2/4-5 COMMAND VALVE
2 - 1-2/4-5 OVERLAP VALVE
6 - DRIVING CLUTCH K1
3 - 1-2/4-5 SHIFT PRESSURE SHIFT VALVE
7 - HOLDING CLUTCH B1
4 - 1-2/4-5 HOLDING PRESSURE SHIFT VALVE
8 - SHIFT PRESSURE REGULATING VALVE

The pressure in clutch B1 (7) acting on the end face of the 1-2/4-5 holding valve (4) forces the valve to up-shift against the spring pressure and allows line pressure (p-A) to pass through the command valve (5).