LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2015 >> Durango SXT, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 132 (3.6L Engine (Service Information)) >> Manifolds >> Manifold, Intake >> Installation >> Upper

Manifold, Intake: Installation: Upper

WARNING: This page is about a different car, the 2016 Dodge Durango. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Fuel Rail Bolts
GC0173652Courtesy of CHRYSLER GROUP, LLC
  1. Prior to installing the upper intake manifold, verify that the four fuel rail bolts (1) were not inadvertently loosened. If loosened, the bolts must tightened in sequence. Refer to RAIL, FUEL, INSTALLATION .
    Fig 2: Upper To Lower Intake Manifold Gaskets
    GC0173670Courtesy of CHRYSLER GROUP, LLC
  2. Clean and inspect the sealing surfaces, the gaskets may be reused if no issues are found. Install the upper to lower intake manifold gaskets.
    Fig 3: Fuel Injector Wire Harness Connectors & Wire Harness
    GC0173757Courtesy of CHRYSLER GROUP, LLC
  3. Make sure the fuel injectors (1) and wiring harnesses (2) are in the correct position so that they don't interfere with the upper intake manifold installation.
    Fig 4: Insulator
    GC0173600Courtesy of CHRYSLER GROUP, LLC
  4. If removed, install the insulator (1) on top of the right cylinder head cover.
  5. Lift and hold the upper intake attaching bolts clear of the mating surface. Back the bolts out slightly or if required, use an elastic band to hold the bolts clear of the mating surface.
    Fig 5: Upper Intake Manifold Bolts Tightening Sequence
    GC0173803Courtesy of CHRYSLER GROUP, LLC
  6. Position the upper intake manifold onto the lower intake manifold so that the locating posts on the upper intake manifold align with corresponding holes in the lower intake manifold.
  7. Install the eight upper intake manifold attaching bolts. Tighten the bolts in the sequence shown in illustration to the proper specification. Refer to TORQUE SPECIFICATIONS .
    Fig 6: Brake Booster Vacuum Hose
    GC0173737Courtesy of CHRYSLER GROUP, LLC
  8. Connect the brake vacuum booster hose (2) to the manifold (1).
    Fig 7: Upper Intake Manifold Support Bracket Bolts
    GC0173759Courtesy of CHRYSLER GROUP, LLC
  9. Install the two upper intake manifold support bracket bolts (1) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS .
    Fig 8: EGR Cooler Hose Clamp
    GC0173706Courtesy of CHRYSLER GROUP, LLC
  10. Connect the EGR cooler hose (1) to the EGR valve.
  11. Connect the EGR valve wire harness connector.
    Fig 9: Coolant Tube Bracket Retaining Nut
    GC0173800Courtesy of CHRYSLER GROUP, LLC
  12. Install the coolant tube bracket onto the studs and tighten the retaining nut (1) to the proper specification. Refer to TORQUE SPECIFICATIONS .
    Fig 10: Front Support Bracket, Nut & Bolt
    GC0173624Courtesy of CHRYSLER GROUP, LLC
  13. Install the support bracket and tighten the nut (1) and bolt (2) to the proper specification. Refer to TORQUE SPECIFICATIONS .
    Fig 11: PCV Hose & Retaining Clips
    GC0173622Courtesy of CHRYSLER GROUP, LLC
  14. Connect the Positive Crankcase Ventilation (PCV) hose (2) to the intake manifold (1).
    Fig 12: Purge Solenoid Vacuum Hose & Purge Solenoid
    GC0173730Courtesy of CHRYSLER GROUP, LLC
  15. If removed, connect the evaporative purge solenoid hose (1) and evaporative purge solenoid (2) to the intake manifold.
    Fig 13: Vapor Purge Line
    GC0173646Courtesy of CHRYSLER GROUP, LLC
  16. Connect the vapor purge line (1) to the solenoid.
    Fig 14: Vapor Purge Line & Wire Harness Connector
    GC0173617Courtesy of CHRYSLER GROUP, LLC
  17. Connect the evaporative purge solenoid wire harness connector (1) and attach the wire harness retainer (2) to the manifold.
    Fig 15: Wire Harness Retainer & Front Engine Wire Harness Connectors
    GC0173616Courtesy of CHRYSLER GROUP, LLC
  18. Connect the front engine wire harness connectors (2) and attach the wire harness retainer (1) to the manifold.
  19. Install the air cleaner intake body. Refer to BODY, AIR CLEANER, INSTALLATION .
  20. Connect the negative battery cable.
  21. Install the engine cover. Refer to COVER, ENGINE, INSTALLATION .