A/C Condenser: Installation
WARNING: This page is about a different car, the 2004 Dodge Dakota. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
If the A/C condenser is being replaced, add 30 milliliters (1 fluid ounce) of refrigerant oil to the refrigerant system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.
- Carefully position the A/C condenser into the engine compartment.
- Align and install the upper A/C condenser mounting tabs to the radiator brackets.
- Install the two bolts that secure the A/C condenser to the radiator. Tighten the bolts to 5 N.m (45 in. lbs.).
- If equipped, position the automatic transmission fluid cooler to the radiator and install the two bolts that secure the transmission cooler to the radiator. Tighten the bolts to 5 N.m (45 in. lbs.).
- Remove the tape or plugs from the liquid line fitting and condenser outlet port.
- Lubricate a new rubber O-ring seal with clean refrigerant oil and install it on the liquid line fitting. Use only the specified G-ring as it is made of a special material for the R-134a system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.
- Connect the liquid line fitting to the condenser outlet port.
- Install the nut that secures the liquid line fitting to the condenser outlet port. Tighten the nut to 22 N.m (16 ft. lbs.).
- Remove the tape or plugs from the discharge line fitting and condenser inlet port.
- Lubricate a new rubber O-ring seal with clean refrigerant oil and install it on the discharge line fitting. Use only the specified O-ring as it is made of a special material for the R-134a system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.
- Connect the discharge line to the condenser inlet port.
- Install the nut that secures the discharge line fitting to the condenser inlet port. Tighten the nut to 22 N.m (16 ft. lbs.).
- Position the radiator and condenser air seal to the right side radiator support and install the four push-pin retainers.
- Reconnect the negative battery cable.
- Evacuate the refrigerant system (Refer to STANDARD PROCEDURE ).
- Charge the refrigerant system (Refer to STANDARD PROCEDURE ).