Switch Continuity Test
NOTE:
Disconnect switch harness before testing switch continuity.
With switch plunger extended, attach test leads to pins 1 and 2. Replace switch if meter indicates no continuity.
With switch plunger retracted, attach test leads to pins 3 and 4. Replace switch if meter indicates no continuity.
With switch plunger retracted, attach test leads to pins 5 and 6. Replace switch if meter indicates no continuity.