Pod, Switch: Installation: Installation
- Position the accessory switch bank module (ASBM) in the center bezel and install the four screws (1).
- Install the instrument panel center bezel (3). Refer to BEZEL, INSTRUMENT CLUSTER, INSTALLATION .
- Connect the battery negative cable.