LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2012 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (3.6L Engine (Service Information)) >> Cylinder Head >> Removal >> Right

Cylinder Head: Removal: Right

WARNING: This page is about a different variant/trim than selected.
Fig 1: Magnetic Timing Wheels
GC0144190Courtesy of CHRYSLER GROUP, LLC
CAUTION:

The magnetic timing wheels (1) must not come in contact with magnets (pickup tools, trays, etc.) or any other strong magnetic field. This will destroy the timing wheels ability to correctly relay camshaft position to the camshaft position sensor.

Fig 2: Negative Battery Cable
GC0139402Courtesy of CHRYSLER GROUP, LLC
  1. Perform the fuel pressure release procedure. Refer to FUEL SYSTEM PRESSURE RELEASE .
  2. Disconnect and isolate the negative battery cable (1).
    Fig 3: Engine Cover
    GC0144028Courtesy of CHRYSLER GROUP, LLC
  3. Lift the engine cover retaining grommets off the ball studs and remove the engine cover (1).
    Fig 4: Inlet Air Temperature (IAT) Sensor Electrical Connector, Air Inlet Hose Assembly & Fasteners
    GC0144029Courtesy of CHRYSLER GROUP, LLC
  4. Disconnect the electrical connector (1) from the Inlet Air Temperature (IAT) sensor.
  5. Loosen the clamp (2) at the throttle body.
  6. Loosen the clamp (3) at the air cleaner housing.
  7. Lift the air inlet hose assembly retaining grommet off the ball stud (4).
  8. Remove the air inlet hose assembly (5).
    Fig 5: Fresh Air Makeup Hose, Air Cleaner Housing & Bolt
    GC0144030Courtesy of CHRYSLER GROUP, LLC
  9. Disconnect the fresh air makeup hose (1) from the air cleaner housing.
  10. Remove the air cleaner housing retaining bolt (2).
  11. Remove the air cleaner housing (3).
    Fig 6: Idler Pulley, Tensioner Arm, Belt, Idler, Tensioner & Belt
    GC0144013Courtesy of CHRYSLER GROUP, LLC
  12. Rotate the accessory drive belt tensioner (7) counterclockwise until it contacts the stop and remove the accessory drive belt (3), then slowly rotate the tensioner into the freearm position.
  13. Remove the generator (1). Refer to GENERATOR, REMOVAL .
    Fig 7: EVAP Purge Solenoid, Electrical Connector & Vacuum Lines
    GC0144652Courtesy of CHRYSLER GROUP, LLC
  14. Disconnect the vacuum line (3) at the EVAP purge solenoid (1).
  15. Disconnect the EVAP purge solenoid vacuum line (4) at the intake manifold and remove the vacuum line.
    Fig 8: PCV Valve, Intake Manifold, Brake Booster Vacuum Hose, MAP Sensor, ETC & CMP Sensor Electrical Connectors
    GC0144654Courtesy of CHRYSLER GROUP, LLC
  16. Disconnect the PCV hose from the PCV valve (1) and the intake manifold (2) and remove hose.
  17. Disconnect the brake booster vacuum hose (3) and position aside.
  18. Disconnect the electrical connector at the Manifold Absolute Pressure (MAP) Sensor (4).
  19. Disconnect the electrical connector at the Electronic Throttle Control (ETC) (5).
  20. Disconnect the electrical connector at the Camshaft Position Sensor (CMP) (6) and position harness aside.
    Fig 9: Upper Intake Manifold & Bolts
    GC0144183Courtesy of CHRYSLER GROUP, LLC
  21. Remove the upper and lower intake manifolds (2) and insulator. Refer to MANIFOLD, INTAKE, REMOVAL .
    Fig 10: Lower Splash Shield & Fasteners
    GC0095584Courtesy of CHRYSLER GROUP, LLC
  22. Raise and support the vehicle. Refer to HOISTING, STANDARD PROCEDURE .
  23. Remove the belly pan retainers (1) and remove the belly pan.
  24. Drain the cooling system. Refer to STANDARD PROCEDURE .
  25. Drain the engine oil. Refer to Engine/Lubrication/OIL - Standard Procedure .
    Fig 11: Right Upstream Oxygen Electrical Sensor Connector, Down Pipe Flanges & Bolts
    GC0144419Courtesy of CHRYSLER GROUP, LLC
  26. Disconnect the right upstream oxygen electrical sensor connector (4) from the main wire harness.
  27. Loosen the lower down pipe flange bolts (3).
  28. Remove the upper down pipe flange bolts (1) and position the down pipe and catalytic converter aside.
    Fig 12: Oil Level Indicator & Retaining Bolt
    GC0144400Courtesy of CHRYSLER GROUP, LLC
  29. Remove the oil level indicator (2) retaining bolt (1) and remove the oil level indicator.
    Fig 13: Heater Core Supply Tube Support Bracket & Retaining Bolt
    GC0144401Courtesy of CHRYSLER GROUP, LLC
  30. Remove the heater core supply tube (1) support bracket retaining bolt (2) and remove the heater core supply tube (1).
    Fig 14: Upper Intake Manifold Support Bracket, Stud & Fasteners
    GC0144428Courtesy of CHRYSLER GROUP, LLC
  31. Disconnect the ignition coil capacitor electrical connector.
  32. Remove the stud (3) and remove the upper intake manifold support bracket (2).
  33. Remove the cylinder head covers, lower and upper oil pans, crankshaft vibration damper and engine timing cover. Refer to COVER(S), ENGINE TIMING, REMOVAL .
    NOTE:

    Take this opportunity to measure timing chain wear. Refer to Engine/Valve Timing - Standard Procedure .

  34. Lower the vehicle.
    Fig 15: Electrical Connector, Ignition Coils & Ignition Coil Retaining Bolts
    GC0144206Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    The left side ignition coils are shown in illustration, the right side ignition coils are similar.

  35. Remove the ignition coils (2). Refer to COIL, IGNITION, REMOVAL .
    CAUTION:

    When aligning timing marks, always rotate engine by turning the crankshaft. Failure to do so will result in valve and/or piston damage.

    CAUTION:

    Always reinstall timing chains so that they maintain the same direction of rotation. Inverting a previously run chain on a previously run sprocket will result in excessive wear to both the chain and sprocket.

    Fig 16: Rotating Crankshaft Clockwise To Position No. 1 Piston At TDC On Exhaust Stroke
    GC0144142Courtesy of CHRYSLER GROUP, LLC
  36. Rotate the crankshaft clockwise to place the number one piston at TDC on the exhaust stroke by aligning the dimple (4) on the crankshaft with the block/bearing cap junction (5). The left side cam phaser arrows (2) should point toward each other and be parallel to the valve cover sealing surface (3). The right side cam phaser arrows (7) should point away from each other and the scribe lines (9) should be parallel to the valve cover sealing surface (8).
  37. Mark the direction of rotation on the timing chain using a paint pen or equivalent to aid in reassembly.
    CAUTION:

    When the timing chains are removed and the cylinder heads are still installed, DO NOT rotate the camshafts or crankshaft without first locating the proper crankshaft position. Failure to do so will result in valve and/or piston damage.

    Fig 17: Resetting Right Cam Chain Tensioner
    GC0144144Courtesy of CHRYSLER GROUP, LLC
  38. Reset the right cam chain tensioner by pushing back the tensioner piston and installing Tensioner Pin (special tool #8514, Pins, Tensioner) (1).
    Fig 18: Phaser Timing Marks, Oil Control Valves & RH Camshaft Phaser Lock
    GC0144136Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Minor rotation of a camshaft (a few degrees) may be required to install the camshaft phaser lock.

  39. Install the RH Camshaft Phaser Lock (special tool #10202, Locks, Camshaft/Phaser) (5).
  40. Loosen both the intake oil control valve (2) and exhaust oil control valve (7).
  41. Remove the RH Camshaft Phaser Lock (special tool #10202, Locks, Camshaft/Phaser) (5).
  42. Remove the oil control valve (2) from the right side intake cam phaser and pull the phaser off of the camshaft.
  43. Remove the oil control valve (7) from the right side exhaust cam phaser and pull the phaser off of the camshaft.
    Fig 19: Right Cam Chain Tensioner, Arm, Guide & Bolts
    GC0144139Courtesy of CHRYSLER GROUP, LLC
  44. Remove the right cam chain tensioner arm (6).
  45. Remove two T30 bolts (4) and the right cam chain tensioner (3).
  46. Remove three T30 bolts (2) and the right cam chain guide (1).
    Fig 20: Cylinder Head Retaining Bolt Removal Sequence - Right
    GC0144193Courtesy of CHRYSLER GROUP, LLC
  47. Remove the right camshafts. Refer to CAMSHAFT, ENGINE, REMOVAL .
    NOTE:

    If the rocker arms are to be reused, identify their positions so that they can be reassembled into their original locations.

  48. Remove the rocker arms. Refer to ROCKER ARM, VALVE, REMOVAL .
    NOTE:

    If the hydraulic lifters are to be reused, identify their positions so that they can be reassembled into their original locations.

  49. If required, remove the hydraulic lifters. Refer to LIFTER(S), HYDRAULIC, REMOVAL .
  50. Using the sequence shown in illustration, remove the cylinder head retaining bolts.
    WARNING:

    The multi-layered steel head gaskets have very sharp edges that could cause personal injury if not handled carefully.

    CAUTION:

    Do not lay the cylinder head on its gasket sealing surface, due to the design of the cylinder head gasket, any distortion to the cylinder head sealing surface may prevent the gasket from properly sealing resulting in leaks.

    Fig 21: Head Gasket & Locating Dowels
    GC0144308Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    The head gasket (1) crimps the locating dowels (2) and the dowels may pull out of the engine block when the head gasket is removed.

  51. Remove the cylinder head and gasket. Discard the gasket.
    Fig 22: Ignition Coil Capacitor & Bolt
    GC0144457Courtesy of CHRYSLER GROUP, LLC
  52. If required, remove the bolt (2) and the ignition coil capacitor (1).