LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 696 (Fuel System - 2500 Hd & 3500 Hd) >> Fuel Injection, Gas >> Valve, Short Runner >> Installation >> 5.7L

Valve, Short Runner: Installation: 5.7L

WARNING: This page is about a different car, the 2014 RAM 3500 HD and 2014 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Short Runner Valve Actuator Rubber O-Ring Seal
GC0118917Courtesy of CHRYSLER GROUP, LLC
  1. Install a new short runner valve actuator rubber O-ring seal (1).
    Fig 2: Short Runner Valve Actuator Retaining Bolts
    GC0118916Courtesy of CHRYSLER GROUP, LLC
  2. Position the short runner valve actuator, install the retaining bolts (1) and tighten to 5 N.m (44 in. lb.).
    Fig 3: Intake Manifold Retaining Bolt Removal & Tightening Sequence
    GC0088124Courtesy of CHRYSLER GROUP, LLC
  3. Install the intake manifold and throttle body as an assembly. Refer to MANIFOLD, INTAKE, GAS, INSTALLATION, 5.7L or MANIFOLD, INTAKE, GAS, INSTALLATION, 6.4L
    Fig 4: Battery
    GC0087848Courtesy of CHRYSLER GROUP, LLC
  4. Connect the negative battery cable (1).