LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 508 (3.6L - DTCS P0461 To P0643) >> Diagnosis And Testing >> P0593-Speed Control Switch 2 Circuit High >> Diagnostic Test

Diagnostic Test

WARNING: This page is about a different car, the 2013 Dodge Avenger and 2013 Chrysler 200. However, it is still accessible from the selected car via links, so may be relevant.
  1. ACTIVE DTC 
    1. Turn the ignition on.
    2. With the scan tool, select View DTCs. Copy DTC and Freeze Frame information.
      NOTE:

      This DTC is a two trip fault. If the scan tool indicates a one trip failure, the possible cause may have been the customer pressing switches simultaneously. Test drive the vehicle and activate the Speed Control system. If the DTC matures to an active fault a repair is necessary.

      NOTE:

      It may be necessary to test drive the vehicle and operate the speed control in order for this DTC to set.

    3. With the scan tool, select View DTCs.

      Is the status Active for this DTC?

      Yes 

      • Go To  2

      No 

  2. CHECK THE (V72) S/C SIGNAL 2 CIRCUIT FOR A SHORT TO VOLTAGE 
    1. Turn the ignition off.
    2. Disconnect the Speed Control Switch harness connector.
    3. Turn the ignition on.
    4. Measure the voltage of the (V72) S/C Signal 2 circuit in the Speed Control Switch harness connector.

      Is the voltage above 5.2 Volts?

      Yes 

      • Repair the (V72) S/C Signal 2 circuit for a short to voltage.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .

      No 

      • Go To  3
  3. SPEED CONTROL SWITCH 
    1. Connect a jumper between ground and the (V72) S/C Signal 2 circuit at the Speed Control Switch harness connector.
    2. With the scan tool, select View DTCs.

      Does the P0592-S/C SWITCH 2 SIGNAL CIRCUIT VOLTAGE TOO LOW set as active or pending with the jumper in place?

      Yes 

      • Go To  4

      No 

      • Replace the Speed Control Switch in accordance with the service information.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
  4. STEERING WHEEL JUMPER HARNESS 
    1. Turn the ignition off.
    2. Disconnect the Clockspring C8 harness connector.
    3. Connect a jumper between ground and the (V72) S/C Signal 2 circuit at the Clockspring C8 harness connector.
    4. Turn the ignition on.
    5. With the scan tool, select View DTCs.

      Does the P0592-S/C SWITCH 2 SIGNAL CIRCUIT VOLTAGE TOO LOW set as active or pending with the jumper in place?

      Yes 

      • Replace the Steering Wheel Jumper harness in accordance with the service information.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .

      No 

      • Go To  5
  5. CLOCKSPRING 
    1. Turn the ignition off.
    2. Disconnect the Clockspring C2 harness connector.
    3. Connect a jumper between ground and the (V72) S/C Signal 2 circuit at the Clockspring C2 harness connector.
    4. Turn the ignition on.
    5. With the scan tool, select View DTCs.

      Does the P0592-S/C SWITCH 2 SIGNAL CIRCUIT VOLTAGE TOO LOW set as active or pending with the jumper in place?

      Yes 

      • Replace the Clockspring in accordance with the service information.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .

      No 

      • Go To  6
  6. CHECK THE (V72) S/C SIGNAL 2 CIRCUIT FOR AN OPEN/HIGH RESISTANCE 
    1. Turn the ignition off.
    2. Disconnect the PCM C1 harness connector.
      CAUTION:

      Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install the GPEC Diagnostic Adaptor to perform the diagnosis.

    3. Connect the (special tool #10436, Adapter, GPEC Diagnostic).
    4. Measure the resistance of the (V72) S/C Signal 2 circuit from the Clockspring C2 harness connector to the GPEC Adaptor.

      Is the resistance below 5.0 Ohms?

      Yes 

      • Go To  7

      No 

      • Repair the (V72) S/C Signal 2 circuit for an open or high resistance.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
  7. CHECK THE (V937) S/C SWITCH RETURN CIRCUIT FOR AN OPEN/HIGH RESISTANCE 
    1. Measure the resistance of the (V937) Switch Return circuit from the Clockspring C2 harness connector to the GPEC Adaptor.

      Is the resistance below 5.0 Ohms?

      Yes 

      • Go To  8

      No 

      • Repair the (V937) S/C Switch Return circuit for an open or high resistance.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
  8. POWERTRAIN CONTROL MODULE 
    1. Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Speed Control Switch and the Powertrain Control Module.
    2. Look for any chafed, pierced, pinched or partially broken wires.
    3. Look for broken, bent, pushed out or corroded terminals.
    4. Perform any Technical Service Bulletins that may apply.

      Were any problems found?

      Yes 

      • Repair as necessary.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .

      No