Diagnostic Test
- DTC IS ACTIVE WARNING:
The normal operating temperature of the exhaust system is very high. Never work around or attempt to service any part of the exhaust system until it has cooled. Special care should be taken when working near any part of the exhaust system. The temperature rises to a high level after a short period of engine operating time.
- Start the engine and allow it to reach normal operating temperature.WARNING:
When the engine is operating, do not stand in direct line with the fan. Do not put your hands near the pulleys, belts or fan. Do not wear loose clothing. Failure to follow these instructions may result in possible serious or fatal injury.
NOTE:Diagnose and repair any system voltage or sensor supply voltage DTCs before continuing with this test.
- With the scan tool, select View DTCs.
Is the status Active for this DTC?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to STANDARD PROCEDURE .
- Start the engine and allow it to reach normal operating temperature.
- (K157) MAF SENSOR SIGNAL CIRCUIT VOLTAGE
- (K957) MAF SENSOR GROUND CIRCUIT TEST Fig 2: Using 12 Volt Test Light Connected To 12 Volts To Check MAF Sensor Ground Circuit In C1 Secondary Air Pump Assembly Harness Connector
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition off.
- Using a 12-volt test light connected to 12 volts, check the (K957) MAF Sensor Ground circuit in the C1 Secondary Air Pump Assembly harness connector.NOTE:
The test light should be illuminated and bright. Compare the brightness to that of a direct connection to the battery.
Is the test light illuminated and bright?
Yes
- Go To 8
No
- Go To 7
- (K157) MAF SENSOR SIGNAL CIRCUIT SHORTED TO VOLTAGE Fig 3: Measuring Voltage Of MAF Sensor Signal Circuit In C1 Secondary Air Pump Assembly Harness Connector
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition off.
- Disconnect the Powertrain Control Module (PCM) C2 harness connector.
- Turn the ignition on.
- Measure the voltage of the (K157) MAF Sensor Signal circuit in the C1 Secondary Air Pump Assembly harness connector.
Is there any voltage present?
Yes
- Repair the (K157) MAF Sensor Signal circuit for a short to voltage.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Go To 4
- (K157) MAF SENSOR SIGNAL CIRCUIT SHORTED TO THE FUSED IGNITION OUTPUT CIRCUIT Fig 4: Measuring Resistance Between MAF Sensor Signal Circuit & Fused ASD/Main Relay Output in C1 Secondary Air Pump Assembly Harness Connector
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition off.
- Measure the resistance between the (K157) MAF Sensor Signal circuit and the Fused Ignition Output in the C1 Secondary Air Pump Assembly harness connector.
Is the resistance below 100 Ohms?
Yes
- Repair the (K157) MAF Sensor Signal circuit for a short to the Fused Ignition Output circuit.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Go To 6
- (K157) MAF SENSOR SIGNAL CIRCUIT OPEN OR HIGH RESISTANCE
Courtesy of CHRYSLER GROUP, LLC
CAUTION:When checking circuits at the Powertrain Control Module (PCM), be careful not to damage or distort the connector terminals. Improper measurement technique could result in poor pin to terminal contact.
- Measure the resistance of the (K157) MAF Sensor Signal circuit between the C1 Secondary Air Pump Assembly harness connector and the Powertrain Control Module (PCM) C2 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 9
No
- Repair the (K157) MAF Sensor Signal for an open circuit or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- Measure the resistance of the (K157) MAF Sensor Signal circuit between the C1 Secondary Air Pump Assembly harness connector and the Powertrain Control Module (PCM) C2 harness connector.
- (K957) MAF SENSOR GROUND CIRCUIT OPEN OR HIGH RESISTANCE
Courtesy of CHRYSLER GROUP, LLC
CAUTION:When checking circuits at the Powertrain Control Module (PCM), be careful not to damage or distort the connector terminals. Improper measurement technique could result in poor pin to terminal contact.
- Measure the resistance of the (K957) MAF Sensor Ground circuit between the C1 Secondary Air Pump Assembly harness connector and the PCM C2 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 9
No
- Repair the (K957) MAF Sensor Ground circuit for an open circuit or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- Measure the resistance of the (K957) MAF Sensor Ground circuit between the C1 Secondary Air Pump Assembly harness connector and the PCM C2 harness connector.
- SECONDARY AIR PUMP ASSEMBLY
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Secondary Air Pump Assembly and the Powertrain Control Module (PCM).
- Look for any chafed, pierced, pinched, or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the related connectors.
- Monitor the scan tool data relative to this circuit and wiggle test the wiring and connectors.
- Look for the data to change or for the DTC to reset during the wiggle test.
- Perform any Technical Service Bulletins that may apply.
Were any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Replace the Secondary Air Pump Assembly in accordance with the Service Information.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- POWERTRAIN CONTROL MODULE (PCM)
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Secondary Air Pump Assembly and the Powertrain Control Module (PCM).
- Look for any chafed, pierced, pinched, or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the related connectors.
- Monitor the scan tool data relative to this circuit and wiggle test the wiring and connectors.
- Look for the data to change or for the DTC to reset during the wiggle test.
- Perform any Technical Service Bulletins that may apply.
Were any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Replace and program the Powertrain Control Module (PCM) in accordance with the Service Information. Refer to MODULE, POWERTRAIN CONTROL, REMOVAL .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .