Diagnostic Test
WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- OTHER DTCS
- Turn the ignition on.
- With the scan tool, read DTCs.
Are other DTCs present?
Yes
- Repair other DTCs first.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
No
- Go To 2
- CHECK THE 5-VOLT SUPPLY CIRCUIT
- Turn the ignition off.
- Disconnect the A/C Pressure Sensor harness connector.NOTE:
Check connectors - Clean/repair as necessary.
- Turn the ignition on.
- Measure the voltage between the (F856) 5-Volt Supply circuit and (K400) Sensor Return circuit of the A/C Pressure Sensor harness connector.
Is the voltage between 4.5 and 5.5 volts?
Yes
- Go To 4
No
- Go To 3
- CHECK THE (F856) 5-VOLT SUPPLY CIRCUIT FOR A SHORT TO VOLTAGE
- Turn the ignition off.
- Disconnect the PCM C2 harness connector.NOTE:
Check connectors - Clean/repair as necessary.
- Turn the ignition on.
- Measure the voltage between the (F856) 5-Volt Supply circuit at the harness connector and ground.
Is the voltage below 1.0 Volt?
Yes
- Go To 4
No
- Repair the (F856) 5-Volt Supply circuit for a short to voltage.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
- CHECK THE (K400) SENSOR RETURN CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- Turn the ignition off.
- Measure the resistance of the (K400) Sensor Return circuit between the A/C Pressure Sensor harness connector and the PCM C2 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 5
No
- Repair the (K400) Sensor Return circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
- CHECK THE (C18) SIGNAL CIRCUIT FOR A SHORT TO VOLTAGE
- Turn the ignition on.
- Measure the voltage between the (C18) A/C Pressure Sensor Signal circuit at the harness connector and ground.
Is the voltage below 1.0 Volt?
Yes
- Go To 6
No
- Repair the (C18) A/C Pressure Sensor Signal circuit for a short to voltage.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
- A/C PRESSURE SENSOR
- Reconnect the PCM C2 harness connector.
- Turn the ignition on.
- With the scan tool, record all Freeze frame data.
- With the scan tool, erase DTCs.
- Turn the ignition off for 75 seconds.
- Turn the ignition on.
- While monitoring scan tool, use a jumper wire to connect the (K400) Sensor Return circuit to the (C18) A/C Pressure Sensor Signal circuit at the A/C Pressure Sensor harness connector.
Did P0532 set?
Yes
- Replace the A/C Pressure Sensor.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
No
- Replace the Powertrain Control Module in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .