Diagnostic Test
WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- ACTIVE DTC
- Test drive the vehicle in Stop/Start mode.
- With the scan tool, view DTCs.NOTE:
If the vehicle has a no crank condition and/or DTC P141D is present along with this DTC, try replacing Starter Relay 2 and recheck for fault being active before proceeding.
Is the DTC active?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to STANDARD PROCEDURE .
- CHECK THE (T762) ICR CONTROL RELAY CONTROL CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- Turn the ignition off.
- Disconnect the PDC C3 harness connector.
- Disconnect the PCM C2 harness connector.
- Measure the resistance of the (T762) ICR Control Relay Control circuit between the PDC C3 harness connector and the PCM C2 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 3
No
- Repair the (T762) ICR Control Relay Control circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- CHECK THE ICR CONTROL RELAY COIL SUPPLY
- Remove Starter Relay 2 from the PDC.
- Using a 12-volt test light connected to ground, probe the 12 volt supply circuit at the Starter Relay 2 connector (terminal 30).NOTE:
Compare the brightness to that of a connection direct battery.
Is the test light illuminated and bright?
Yes
- Go To 4
No
- Repair the open 12 volt supply to the Starter Relay 2.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- CHECK THE ICR CONTROL RELAY
- Connect a jumper across terminal 30 and terminal 87 of the Starter Relay 2 connector.
- Measure the voltage of the (T762) ICR Control Relay Control circuit at the PDC C3 harness connector with the jumper in place.
Is the voltage equal to battery voltage?
Yes
- Go To 5
No
- Replace the PDC in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
- POWERTRAIN CONTROL MODULE (PCM)
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Power Distribution Center and the Powertrain Control Module (PCM).
- Look for any chafed, pierced, pinched or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the Switch and Powertrain Control Module connectors.
- Perform any Technical Service Bulletins that may apply.
Were there any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .
No
- Replace and program the Powertrain Control Module (PCM) in accordance with the service information. Refer to MODULE, POWERTRAIN CONTROL, REMOVAL .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to STANDARD PROCEDURE .