LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 358 (Exhaust System - 2500 Hd & 3500 Hd) >> Pipe, Exhaust >> Installation >> 6.7L Diesel

6.7L Diesel

WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Removing/Installing Exhaust Pipe
GC0155466Courtesy of CHRYSLER GROUP, LLC
  1. Position the exhaust pipe (3) onto the turbocharger with the clamp (5) facing down as shown in illustration. Tighten clamp (5) finger tight.
  2. Using a new flange gasket, position exhaust pipe (3) on DOC/DPF flange and turbocharger flange.
  3. Install flange nuts (2). Tighten nuts (2) to 64 N.m (47 ft. lbs.).
  4. Install transmission mounted exhaust pipe support (4). Tighten bolts to 43 N.m (32 ft. lbs.).
  5. 4X4 Vehicles - Install transmission crossmember. Refer to CROSSMEMBER, TRANSMISSION, INSTALLATION .
  6. 4X4 Vehicles - Install transfer case skid plate. Refer to PLATE, SKID, TRANSFER CASE, INSTALLATION .
  7. Check the exhaust system for contact with the body panels. A minimum of 25 mm (1.0 in.) is required between the exhaust system components and body/frame parts. Make the necessary adjustments, if needed.
  8. Tighten the DOC to turbocharger band clamp to 17 N.m (150 in. lbs.). Using a rubber mallet, hit the DOC to turbocharger band clamp three times around the perimeter of the clamp and tighten the clamp to 17 N.m (150 in. lbs.).
  9. Lower the vehicle.
  10. Start the engine and inspect for exhaust leaks. Repair exhaust leaks as necessary.