LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 356 (Engine Cooling System - 2500 Hd & 3500 Hd) >> Transmission >> Tubes And Hoses, Transmission Oil Cooler >> Standard Procedure >> Standard Procedure - Transmission Cooler Line Quick Connect Fitting Disassembly/Assembly >> Connect

Standard Procedure - Transmission Cooler Line Quick Connect Fitting Disassembly/Assembly: Connect

WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Oil Cooler Line Quick Connect Fitting - Assembly
GC0083422Courtesy of CHRYSLER GROUP, LLC
1 - QUICK CONNECT FITTING
2 - CLIP
3 - OIL COOLER LINE
4 - DUST CAP
  1. Align transmission cooler line with quick connect fitting while pushing straight into the fitting.
  2. Push in on transmission cooler line until a "click" is heard or felt.
  3. Slide dust cap down the transmission cooler line and snap it over the quick connect fitting until it is fully seated and rotates freely. Dust cap will only snap over quick connect fitting when the transmission cooler line is properly installed.
NOTE:

If dust cap will not snap into place, repeat assembly step 2.