6.7L - Diesel
WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- Install the transmission oil cooler (2). Tighten bolts (1) to 8 N.m (71 in. lbs.).
- Connect the transmission cooler lines (3) and install spring clips.
- Install both transmission safety locks.
- Install the secondary radiator. Refer to RADIATOR, ENGINE COOLING, INSTALLATION .
- Connect both negative battery cables.
- Start the engine and check all fittings for leaks.
- Check the automatic transmission fluid level and fill as necessary.