LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 356 (Engine Cooling System - 2500 Hd & 3500 Hd) >> Engine >> Pump, Water >> Installation >> 5.7L

Pump, Water: Installation: 5.7L

WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Thermostat Housing, Water Pump, Belt Tensioner, & Idler Pulley
GC0137090Courtesy of CHRYSLER GROUP, LLC
  1. Clean mating surfaces and install water pump (3). Tighten mounting bolts to 24 N.m (18 ft. lbs.).
  2. Install upper metal heater tube.
  3. Install belt tensioner assembly (4). Refer to TENSIONER, BELT, INSTALLATION .
  4. Install idler pulley (5).
  5. Install the lower radiator hose.
  6. Install serpentine belt. Refer to BELT, SERPENTINE, INSTALLATION .
  7. Install the resonator mounting bracket.
  8. Install cooling fan assembly. Refer to FAN, COOLING, ELECTRIC, INSTALLATION  and FAN, COOLING, VISCOUS, INSTALLATION .
  9. Install the upper radiator hose to the thermostat housing (1).
  10. Install the air intake assembly. Refer to BODY, AIR CLEANER, INSTALLATION, 5.7L GAS or BODY, AIR CLEANER, INSTALLATION, 5.7L CNG .
  11. Connect negative battery cable.
  12. Evacuate air and refill cooling system. Refer to STANDARD PROCEDURE .
  13. Check cooling system for leaks. Refer to DIAGNOSIS AND TESTING .