LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 350 (5.7L CNG Engine (Service Information) 2500 Hd) >> Cylinder Head >> Rocker Arm, Valve >> Installation >> Installation

Rocker Arm, Valve: Installation: Installation

WARNING: This page is about a different car, the 2013 RAM 2500 HD and 2012 RAM Pickup. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Pushrod Retaining Plate
GC0081766Courtesy of CHRYSLER GROUP, LLC
CAUTION:

The longer pushrods are for the exhaust side and the shorter pushrods are for the intake side.

  1. Install the pushrods in the same order as removed.
  2. Install the pushrod retainer (special tool #9070, Retainer, Push Rod) (1).
    Fig 2: Retainers, Rocker Arm & Rocker Shaft
    GC0088046Courtesy of CHRYSLER GROUP, LLC
    CAUTION:

    Make sure that the retainers (1) and the rocker arms (2) are not overlapped when tightening bolts or engine damage could result.

    CAUTION:

    Due to the changes in the pushrod clearance holes in the Eagle 5.7L cylinder heads, close attention must be given when installing the pushrod(s) into the tappet(s). Once the pushrod(s) have been installed, use a suitable light to look down through the pushrod hole(s). This will allow you to verify the pushrod(s) are centered properly in the tappet(s) and avoid engine damage. Recheck after the rocker shaft assembly has been installed and tightened to specification.

    Fig 3: Intake Rocker Arm Marking
    GC0088045Courtesy of CHRYSLER GROUP, LLC
    CAUTION:

    The rocker shaft assemblies are not interchangeable between the intake and the exhaust, failure to install them in the correct location could result in engine damage. The intake rocker arms (1) are marked with the letter "I" (2).

    Fig 4: Rocker Shafts Retaining Bolt Removal & Tightening Sequence
    GC0088038Courtesy of CHRYSLER GROUP, LLC
  3. Install the rocker shaft assemblies in the same order as removed.
  4. Using the sequence shown in illustration, tighten the rocker shaft bolts to 22 N.m (16 ft. lbs.).
    CAUTION:

    Do Not rotate or crank the engine during or immediately after rocker arm installation. Allow the hydraulic roller tappets adequate time to bleed down (about five minutes).

    Fig 5: Pushrod Retaining Plate
    GC0081766Courtesy of CHRYSLER GROUP, LLC
  5. Remove pushrod retainer (special tool #9070, Retainer, Push Rod) (1).
    Fig 6: Cylinder Head Cover Removal/Tightening Sequence
    GC0080292Courtesy of CHRYSLER GROUP, LLC
  6. Using the sequence shown in illustration, install the cylinder head cover. Refer to COVER(S), CYLINDER HEAD, INSTALLATION, 5.7L .
    Fig 7: Removing/Installing Ignition Coil
    GC0080076Courtesy of CHRYSLER GROUP, LLC
  7. Install the ignition coils (1). Refer to INSTALLATIONCOIL, IGNITION, REMOVAL .
  8. Install the engine cover.
    Fig 8: Battery
    GC0087848Courtesy of CHRYSLER GROUP, LLC
  9. Connect the negative battery cable (1).