LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 343 (Propeller Shaft - 2500 Hd & 3500 Hd) >> Bearing, Drive Shaft Center, Light Duty >> Installation >> Installation

Bearing, Drive Shaft Center, Light Duty: Installation: Installation

WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Center Bearing & Collar
GC0091581Courtesy of CHRYSLER GROUP, LLC
  1. Install new slinger on shaft if removed and drive into position with appropriate installer tool.
  2. Install new center bearing (1) and boot collar (2) on shaft.
    Fig 2: Installing Bearing & Collar
    GC0083221Courtesy of CHRYSLER GROUP, LLC
  3. Install bearing (1) and boot collar (2) on shaft with Installer (special tool #6052, Installer, Bearing/Seal) (3).
    Fig 3: Slip Joint Boot & Clamp
    GC0083219Courtesy of CHRYSLER GROUP, LLC
  4. Clean shaft splines and apply a coat of multi-purpose grease.
  5. Align master splines and slide front and rear half-shafts together.
  6. Position slip yoke boot (1) on boot collar and install clamp (2).
  7. Install propeller shaft in vehicle.