LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 24 (Emissions Control) >> Exhaust Gas Recirculation, 6.7L Diesel >> VALVE, Exhaust Gas Recirculation (EGR), 6.7L >> Installation >> Pick Up Models

Pick Up Models

WARNING: This page is about a different car, the 2011 RAM Pickup and 2011 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Removing/Installing EGR Valve Gaskets
GC0110296Courtesy of CHRYSLER LLC
  1. Install a new EGR crossover tube gasket (1).
  2. Install a new gasket (4) to bottom of EGR valve (2).
    Fig 2: Removing/Installing EGR Valve Assembly - 6.7L
    GC0108459Courtesy of CHRYSLER LLC
  3. Position EGR valve assembly (2) and install the four EGR valve mounting bolts (1) finger tight.
    Fig 3: Removing/Installing EGR Crossover Tube
    GC0137182Courtesy of CHRYSLER LLC
  4. Install clamps (3) at end of EGR crossover tube (2).
  5. Install bolt (5) at center bottom of EGR crossover tube finger tight.
  6. Tighten clamp (3) first to 10 N.m. (89 in. lbs.), then tighten clamp (1) to 10 N.m. (89 in. lbs.).
  7. Tighten bolt (5) to 10 N.m (89 in. lbs.).
    Fig 4: Removing/Installing EGR Valve Assembly - 6.7L
    GC0108459Courtesy of CHRYSLER LLC
  8. Tighten the four EGR valve mounting bolts (1) in a cross-cross fashion to 24 N.m (18 ft. lbs.) .
    Fig 5: Removing/Installing EGR Temperature Sensor
    GC0110284Courtesy of CHRYSLER LLC
    1 EGR Temperature Sensor
    2 Sensor Harness Connector
    3 Crossover Tube
    4 EGR Actuator
    5 EGR Actuator Harness Connector
    6 EGR Tube
  9. Connect the EGR valve harness connector (5).
    Fig 6: Removing/Installing EGR Crossover Tube Cover
    GC0108069Courtesy of CHRYSLER LLC
  10. Install EGR crossover tube cover (2). Tighten bolts (1) to 10 N.m (89 in. lbs.).
  11. Connect both negative battery cables.