LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 24 (Emissions Control) >> Exhaust Gas Recirculation, 6.7L Diesel >> VALVE, Exhaust Gas Recirculation (EGR), 6.7L >> Installation >> Cab/Chassis Models

Cab/Chassis Models

WARNING: This page is about a different car, the 2011 RAM Pickup and 2011 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Removing/Installing EGR Valve Gaskets
GC0110296Courtesy of CHRYSLER LLC
  1. Install new gasket (1) to end of EGR tube.
    Fig 2: Removing/Installing EGR Valve Assembly - 6.7L
    GC0108459Courtesy of CHRYSLER LLC
  2. Position EGR valve assembly (2) and install the four EGR valve mounting bolts (1) finger tight.
    Fig 3: Removing/Installing EGR Crossover Tube
    GC0110290Courtesy of CHRYSLER LLC
  3. Install and lightly tighten two clamps (1) and (3) at ends of EGR crossover tube.
  4. Install "P" clamp bolt (5) finger tight only.
  5. Tighten clamp (1) first to 10 N.m. (89 in. lbs.), then tighten clamp (3) to 10 N.m. (89 in. lbs.).
  6. Tighten "P" clamp bolt (5) to 10 N.m (89 in. lbs.).
    Fig 4: Removing/Installing EGR Valve Assembly - 6.7L
    GC0108459Courtesy of CHRYSLER LLC
  7. Tighten the four EGR valve mounting bolts in a criss-cross fashion to 24 N.m (18 ft. lbs.).
    Fig 5: Removing/Installing EGR Temperature Sensor
    GC0110284Courtesy of CHRYSLER LLC
    1 EGR Temperature Sensor
    2 Sensor Harness Connector
    3 Crossover Tube
    4 EGR Actuator
    5 EGR Actuator Harness Connector
    6 EGR Tube
  8. Connect the EGR Actuator harness connector (5).
    Fig 6: Removing/Installing EGR Crossover Tube Cover
    GC0108069Courtesy of CHRYSLER LLC
  9. Install EGR crossover tube cover (2). Tighten bolts (1) to 10 N.m (89 in. lbs.).
  10. Connect both negative battery cables.