COOLER and HOSES, Charge Air: Installation: Installation
WARNING: This page is about a different car, the 2011 RAM Pickup and 2011 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
| 1 - BOLT |
| 2 - CHARGE AIR COOLER |
| 3 - CLAMP |
| 4 - BOOST TUBE |
- Position the charge air cooler (2). Install the bolts (1) and tighten to 2 N.m (17 in. lbs.) torque.
- Install the air intake system tubes (4) to the charge air cooler (2). With the clamps in position, tighten the clamps to 11 N.m (95 in. lbs.) torque.
- Install the transmission auxiliary cooler (if equipped). Refer to COOLER, Transmission Oil, Installation .
- Install the A/C condenser (if A/C equipped). Refer to CONDENSER, A/C, Installation . Recharge A/C system. Refer to Plumbing, Standard Procedure .
- Connect the battery negative cables.
- Start engine and check for boost system leaks.
- Install the front grille assembly. Refer to GRILLE, Installation .