LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 21 (5.7L Engine (Service Information)) >> Engine Block >> CAMSHAFT, Engine >> Installation >> Camshaft

CAMSHAFT, Engine: Installation: Camshaft

WARNING: This page is about a different car, the 2011 RAM Pickup and 2011 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Removing/Installing Camshaft
GC0092120Courtesy of CHRYSLER LLC
  1. Lubricate the camshaft lobes and camshaft bearing journals and insert the camshaft (1).
    Fig 2: Camshaft Thrust Plate
    GC0088060Courtesy of CHRYSLER LLC
    NOTE:

    Ensure that the plate is installed on the correct side. The fasteners are flat head fasteners so the top of the head of the fastener should not stick above the front face of the plate after they are torqued. The plate has chamfered fastener holes and the chamfered side should be facing forward to ensure the fasteners are flush or below the front surface.

  2. Install the camshaft thrust plate (1).
    Fig 3: Camshaft Thrust Plate Bolt Tightening Sequence
    GC0088062Courtesy of CHRYSLER LLC
  3. Using the sequence shown in illustration, tighten the bolts to 12 N.m (9 ft. lbs.).
    NOTE:

    The camshaft phaser must be installed before the camshaft end play can be measured.

  4. Measure camshaft end play. Refer to SPECIFICATIONS .
  5. If not within limits, disassemble, clean, and inspect for burrs or debris. Reassemble and measure end play again. If the end play is still out, then install a new thrust plate.
    Fig 4: Timing Chain
    GC0088059Courtesy of CHRYSLER LLC
  6. Install the timing chain (5) and sprockets (1, 3). Refer to CHAIN and SPROCKETS, Timing , Installation , 5.7L .
  7. Install the timing chain tensioner arm (4) and guide (2).
    Fig 5: Timing Chain Tensioner Pin
    GC0088063Courtesy of CHRYSLER LLC
  8. Remove the tensioner pin (special tool #8514, Pins, Tensioner) (1).
    Fig 6: Oil Pump Retaining Bolts
    GC0088058Courtesy of CHRYSLER LLC
  9. Install the oil pump (1) and tighten bolts to 28 N.m (21 ft. lbs.). Refer to PUMP, Engine Oil , Installation , 5.7L .
    Fig 7: Oil Pick Up Tube
    GC0088057Courtesy of CHRYSLER LLC
  10. Inspect the oil pick up tube O-rings and replace as necessary.
  11. Install the oil pick up tube (1) and tighten fasteners (2) to 28 N.m (21 ft. lbs.).
  12. Install the timing chain cover. Refer to COVER(S), Engine Timing , Installation , 5.7L .
  13. Install the oil pan. Refer to PAN, Oil , Installation , 5.7L .
    CAUTION:

    Engines equipped with MDS use both standard roller lifters (2) and deactivating roller lifters (1). The deactivating roller lifters must be used in cylinders 1,4,6,7. The deactivating lifters can be identified by the two holes in the side of the lifter body (3), for the latching pins.

    NOTE:

    Each tappet reused must be installed in the same position from which it was removed. When camshaft is replaced, all of the tappets must be replaced. 

    Fig 8: Rear MDS Lifter Assembly
    GC0088064Courtesy of CHRYSLER LLC
  14. Install the rear MDS lifter assembly (2) and tighten bolt (1) to 12 N.m (106 in. lbs.)
    Fig 9: Front MDS Lifter Assembly
    GC0088065Courtesy of CHRYSLER LLC
  15. Install the front MDS lifter assembly (2) and tighten bolt (1) to 12 N.m (106 in. lbs.).
    Fig 10: Cylinder Head & Gasket
    GC0080293Courtesy of CHRYSLER LLC
  16. Install both the left and right cylinder heads (4). Refer to Cylinder Head , Installation , 5.7L .
  17. Install pushrods.
  18. Install rocker arms. Refer to ROCKER ARM, Valve , Installation , 5.7L .
    Fig 11: Cylinder Head Cover Torque Sequence
    GC0080292Courtesy of CHRYSLER LLC
  19. Install cylinder head covers. Refer to COVER(S), Cylinder Head , Installation , 5.7L .
    Fig 12: Accessory Drive Belt
    GC0088055Courtesy of CHRYSLER LLC
  20. Install the intake manifold. Refer to MANIFOLD, Intake , Installation , 5.7L .
  21. Install the generator (2).
  22. Install the power steering pump (3).
  23. Install the accessory drive belt (1). Refer to BELT, Serpentine , Installation .
  24. Install the radiator. Refer to RADIATOR, Engine Cooling , Installation .
  25. Install the air cleaner assembly. Refer to BODY, Air Cleaner , Installation , 5.7L .
  26. Install the negative battery cable.
  27. Fill the radiator with coolant. Refer to Standard Procedure .
  28. Fill the engine with oil. Refer to FILTER, Engine Oil , Installation , 5.7L .
  29. Start the engine and check for leaks.