LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1619 (Rear Axle - 292 Aa (11 1/2) - 2500 Hd) >> Bearing, Differential Side >> Installation >> With ELSD

With ELSD

WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
GC0169739Courtesy of CHRYSLER GROUP, LLC
NOTE:

The gap in the actuator preload spring must be orientated so they are down and nested into the spring pocket.

  1. For the ring gear side bearing, install the actuator preload spring (1) so that it nests into the actuator spring pocket (2).
    GC0083331Courtesy of CHRYSLER GROUP, LLC
    WARNING:

    Use welding gloves when handling heated components. Failure to follow these instructions will result in personal injury.

    CAUTION:

    A bearing heater (2) is used to install Trac-Rite™ differential case bearings (1). Use only a bearing heater/hot plate and follow manufacture's instructions. Heat components to 100 - 177 Celsius (212° - 350° Max Fahrenheit). Never use an open flame to heat components. Never leave components on heater for and extended amount of time. If component is discolored after heating the component has been overheated and must not be used. Failure to follow these instructions will result in component damage.

  2. Heat differential case bearings (1) with bearing heater (2).
  3. With welding gloves or tongs install bearings on differential case.
    GC0107871Courtesy of CHRYSLER GROUP, LLC
  4. Install open differential case (2) bearings (3) with Installer (special tool #8965, Installer, Differential Bearing) (4) and Handle (special tool #C-4171, Driver Handle, Universal) (1).
  5. Install differential case into housing.