LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1576 (6.7L Engine (Service Information) - 2500 Hd) >> Turbocharger System >> Turbocharger >> Diagnosis And Testing >> Variable Geometry Mechanism Checks - 6.7L

Variable Geometry Mechanism Checks - 6.7L

WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
GC0108625Courtesy of CHRYSLER GROUP, LLC
  1. Remove the turbocharger actuator. Refer to ACTUATOR, TURBOCHARGER, REMOVAL, 6.7L .
  2. Inspect the turbocharger sector gear (3) and the bearing housing (1) surface for damage. Replace the turbocharger if damaged.
    NOTE:

    Do not use tools of any kind to force sector gear to move.

  3. Rotate the sector gear (3) clockwise and counterclockwise. If the turbocharger sector gear (3) binds or does not move, replace the turbocharger.
    GC0155144Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Use the sector gear travel gauge, Part Number 4919281 that comes with new actuator, to be sure the sector gear moves through its operating range.

  4. Install the sector gear travel gauge (2) by carefully bending the gauge and slide the thin section under the sector gear. If necessary, pull the sector gear out by hand to allow more clearance for the gauge. Verify that the three alignment bosses are fully engaged in the bearing housing.
    GC0155315Courtesy of CHRYSLER GROUP, LLC
  5. Rotate the sector gear counterclockwise  towards the turbocharger compressor cover. The edge of the sector gear must  be in the green acceptance zone of the gauge.
    GC0155165Courtesy of CHRYSLER GROUP, LLC
  6. Rotate sector gear (1) clockwise toward the turbocharger turbine housing. The edge of the sector gear must  be in the green acceptance zone of the gauge.
    GC0155322Courtesy of CHRYSLER GROUP, LLC
  7. If the sector gear does not go through its entire range of motion, or if the sector gear is seized, the entire turbocharger assembly must be replaced.
  8. Install the turbocharger actuator. Refer to ACTUATOR, TURBOCHARGER, INSTALLATION, 6.7L .