LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1569 (Engine Cooling System - 2500 Hd) >> Engine >> Pump, Water >> Installation >> 5.7L

Pump, Water: Installation: 5.7L

WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
GC0137090Courtesy of CHRYSLER GROUP, LLC
  1. Clean mating surfaces and install water pump (3). Tighten mounting bolts to the proper torque specifications. Refer to TECHNICAL SPECIFICATIONS .
  2. Install upper metal heater tube.
  3. Install belt tensioner assembly (4). Refer to TENSIONER, BELT, INSTALLATION .
  4. Install idler pulley (5).
  5. Install the lower radiator hose.
  6. Install serpentine belt. Refer to BELT, SERPENTINE, INSTALLATION .
  7. Install the resonator mounting bracket.
  8. Install cooling fan assembly. Refer to FAN, COOLING, VISCOUS, INSTALLATION .
  9. Install the upper radiator hose to the thermostat housing (1).
  10. Install the air intake assembly. Refer to INSTALLATION .
  11. Connect negative battery cable.
  12. Evacuate air and refill cooling system. Refer to STANDARD PROCEDURE .
  13. Check cooling system for leaks. Refer to DIAGNOSIS AND TESTING .