LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1320 (Front Axle - 235 Aa (9 1/4) - 2500 Hd & 3500 Hd) >> U-Joint, Single CARDAN >> Installation >> Installation

U-Joint, Single CARDAN: Installation: Installation

WARNING: This page is about a different car, the 2016 RAM 3500 HD and 2016 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: U-Joint Cross
GC0107662Courtesy of CHRYSLER GROUP, LLC
CAUTION:

Keep cross and bearing cap straight during installation. Failure to follow these instruction will result in damage.

  1. Pack bearing caps 1/3 full of wheel bearing lubricant. Apply extreme pressure (EP), lithium-base lubricant to aid in installation.
  2. Position cross (1) in the shaft yoke (2).
    Fig 2: Press Shaft 1st Cup
    GC0107663Courtesy of CHRYSLER GROUP, LLC
  3. Tap bearing cap into the yoke bores far enough to position cross.
  4. Position receiver/socket (1) on shaft yoke and driver/socket (2) on bearing cap in press.
    Fig 3: Shaft 1st Snap Ring
    GC0107664Courtesy of CHRYSLER GROUP, LLC
  5. Press bearing cap into shaft yoke (1) until bearing cap snap ring groove is visible and install snap ring (2).
    Fig 4: Press Shaft 2nd Cup
    GC0107665Courtesy of CHRYSLER GROUP, LLC
  6. Position receiver/socket (1) on shaft yoke and driver/socket (2) on bearing cap in press.
    Fig 5: Shaft 2nd Snap Ring
    GC0107666Courtesy of CHRYSLER GROUP, LLC
  7. Press bearing cap into shaft yoke (1) until bearing cap snap ring groove is visible and install snap ring (2).
    Fig 6: Stub Shaft On Cross
    GC0107667Courtesy of CHRYSLER GROUP, LLC
  8. Install stub shaft yoke (1) on U-joint cross (2).
    Fig 7: Press Stub Shaft 1st Cup
    GC0107668Courtesy of CHRYSLER GROUP, LLC
  9. Tap fist bearing cap into the stub shaft yoke bore far enough to position cross.
  10. Position receiver/socket (1) on shaft yoke and driver/socket (2) on bearing cap in press.
    Fig 8: Stub Shaft 1st Snap Ring
    GC0107669Courtesy of CHRYSLER GROUP, LLC
  11. Press bearing cap into stub shaft yoke (1) until bearing cap snap ring groove is visible and install snap ring (2).
    Fig 9: Stub Shaft 2nd Cup
    GC0107670Courtesy of CHRYSLER GROUP, LLC
  12. Position receiver/socket (1) on stub shaft yoke and driver/socket (2) on bearing cap in press.
    Fig 10: Stub Shaft 2nd Snap Ring
    GC0107671Courtesy of CHRYSLER GROUP, LLC
  13. Press bearing cap into stub shaft yoke (1) until bearing cap snap ring groove is visible and install snap ring (2).
  14. Install axle shaft.