LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 131 (3.7L Engine (Service Information)) >> Valve Timing >> Cover(S), Engine Timing >> Installation >> Installation

Cover(S), Engine Timing: Installation: Installation

WARNING: This page is about a different car, the 2012 RAM Pickup. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Timing Chain Cover, O-Rings & Sealant Location
GC0083563Courtesy of CHRYSLER GROUP, LLC
1 - TIMING CHAIN COVER
2 - WATER PASSAGE O-RING
3 - MOPAR® ENGINE RTV SEALER
CAUTION:

Do not use oil based liquids to clean timing cover or block surfaces. Use only rubbing alcohol, along with plastic or wooden scrapers. Use no wire brushes or abrasive wheels or metal scrapers, or damage to surfaces could result.

  1. Clean timing chain cover and block surface using rubbing alcohol.
    CAUTION:

    The 3.7L uses a special anerobic sealer instead of a gasket to seal the timing cover to the engine block, from the factory. For service repairs, Mopar® Engine Grey RTV must be used as a substitute.

  2. Inspect the water passage o-rings for any damage, and replace as necessary.
  3. Apply Mopar® Grey Engine RTV sealer (3) to front cover (1) following the path provided using a 3 to 4 mm thick bead (3). Refer to Fig 1.
    Fig 2: Timing Chain Cover Assembly Removal/Tightening Sequence
    GC0083564Courtesy of CHRYSLER GROUP, LLC
  4. Install cover. Tighten fasteners in sequence as shown in illustration in to 58 N.m (43 ft. lbs.). Refer to Fig 2.
  5. Install crankshaft damper. Refer to DAMPER, VIBRATION, INSTALLATION, 3.7L .
  6. Install the A/C compressor. Refer to COMPRESSOR, A/C, INSTALLATION .
  7. Install the generator. Refer to GENERATOR, INSTALLATION .
  8. Install accessory drive belt tensioner assembly. Refer to TENSIONER, BELT, INSTALLATION .
  9. Install radiator upper and lower hoses.
  10. Install both heater hoses.
  11. Install electric fan shroud and viscous fan drive assembly.
  12. Fill cooling system. Refer to STANDARD PROCEDURE .
  13. Connect the battery negative cable.