LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 130 (Exhaust System) >> Pipe, Exhaust >> Installation >> 3.7L/4.7L/5.7L

Pipe, Exhaust: Installation: 3.7L/4.7L/5.7L

WARNING: This page is about a different car, the 2012 RAM Pickup and 2012 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Exhaust Pipe, Manifold Bolts & J-Nuts
GC0144005Courtesy of CHRYSLER GROUP, LLC
  1. Position the exhaust pipe (3) with proper clearance between the frame and underbody parts. A minimum clearance of 25 mm (1.0 in.) is required.
  2. Position the exhaust pipe (3) to manifolds. Install the new  bolts (1) and new  J-nuts (2).
  3. Hand tighten the nuts while making sure the flange is evenly  positioned around the pipe.
  4. Alternate tightening sequence to further ensure the flange stays even around the pipe. Tighten the nuts to 31 N.m (23 ft. lbs.).
  5. Tighten the clamp nuts to 54 N.m (40 ft. lbs.) torque.
  6. Lower the vehicle.
  7. Start the engine and inspect for exhaust leaks and exhaust system contact with the body panels. Adjust the alignment, if needed. Refer to DIAGNOSIS AND TESTING .