Air To Oil Cooler - Diesel
WARNING: This page is about a different car, the 2012 RAM Pickup and 2012 RAM Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
| 1 - MOUNTING BOLTS |
| 2 - THERMOSTATIC BYPASS VALVE |
| 3 - RADIATOR |
| 4 - QUICK-CONNECT FITTINGS |
| 5 - TRANSMISSION OIL COOLER |
- Carefully position the oil cooler assembly to the vehicle.
- Install two nuts and one bolt. Tighten to 11 N.m (95 in. lbs.) torque.
- Connect the quick-connect fittings to the transmission cooler lines. Refer to TUBES AND HOSES, TRANSMISSION OIL COOLER, STANDARD PROCEDURE .
- Install Charge Air Cooler. Refer to COOLER AND HOSES, CHARGE AIR, INSTALLATION, 6.7L .
- Start the engine and check all fittings for leaks.
- Check the fluid level in the automatic transmission.