LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1108 (Fuel System - 1500) >> Fuel Delivery, Diesel >> Valve, Cascade Overflow >> Installation >> Installation

Valve, Cascade Overflow: Installation: Installation

WARNING: This page is about a different car, the 2016 RAM 1500. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Cascade Overflow Valve, Orifices & Filter Screen
GC0158060Courtesy of CHRYSLER GROUP, LLC
  1. Inspect the cascade overflow valve O-ring seals (1, 3).
    Fig 2: Remove/Install Components Cascade Overflow Valve
    GC0158002Courtesy of CHRYSLER GROUP, LLC
  2. Install the cascade overflow valve (1) and tighten to 18 N.m (13 ft. lbs.).
    Fig 3: High Pressure Pump Blocker Shield & Bolts
    GC0146780Courtesy of CHRYSLER GROUP, LLC
  3. Install the fuel injection pump blocker shield (1). Tighten the bolts (2) to 25 N.m (18 ft. lbs.).
    Fig 4: Removing/Installing Engine Cover
    GC0158138Courtesy of CHRYSLER GROUP, LLC
  4. Install the engine cover (1).