Diagnostic Test
WARNING: This page is about a different car, the 2015 RAM 3500 HD and 2015 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK FOR AN ACTIVE DTC
- Turn the ignition on.
- With the scan tool, erase DTCs in the Powertrain Control Module (PCM).
- With the scan tool, actuate the SRV Solenoid Control State.
- With the scan tool, read DTCs.
Is the DTC active?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to INTERMITTENT CONDITION .
- CHECK THE (F342) ASD RELAY OUTPUT CIRCUIT FOR AN OPEN OR HIGH RESISTANCE Fig 1: Using 12-Volt Test Light Connected To Ground To Check (F344) ASD Relay Output Circuit In Short Runner Valve Assembly Harness Connector
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition off.
- Disconnect the Short Runner Valve Assembly harness connector.
- Turn the ignition on.
- With the scan tool, actuate the Auto Shutdown (ASD) Relay Control State.
- Using a 12-volt test light connected to ground, check the (F342) ASD Relay Output circuit in the Short Runner Valve Assembly harness connector.NOTE:
The test light should be illuminated and bright. Compare the brightness to that of a direct connection to the battery.
Is the test light illuminated and bright?
Yes
- Go To 3
No
- Repair the (F342) ASD Relay Output circuit for an open circuit or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
- CHECK THE (Z908) SRV GROUND CIRCUIT FOR AN OPEN OR HIGH RESISTANCE
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition off.
- Measure the resistance of the (Z908) SRV ground circuit in the Short Runner Valve Assembly harness connector to ground.
Is the resistance less than 5.0 Ohms?
Yes
- Go To 4
No
- Repair the (Z908) SRV ground circuit for an open circuit or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
- SHORT RUNNER VALVE ASSEMBLY Fig 3: Using 12-Volt Test Light Connected To Ground To Check (K238) SRV Control Circuit In Short Runner Valve Assembly Harness Connector
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition on.
- With the scan tool, actuate the SRV Solenoid Control State to toggle.
- Using a 12-volt test light connected to ground, check the (K238) SRV Control circuit in the SRV harness connector.NOTE:
If the DTC is active, the actuation test may not be allowed by the PCM. If may be necessary to clear the DTCs before starting the actuation.
NOTE:The test light should illuminate on and off with the actuation.
Does the test light illuminate on and off with the actuation?
Yes
- Replace the Short Runner Valve Assembly in accordance with the Service Information. Refer to MANIFOLD, INTAKE, REMOVAL, 5.7L .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
No
- Go To 5
- CHECK THE (K238) SRV CONTROL CIRCUIT FOR A SHORT TO GROUND Fig 4: Measuring Resistance Between Ground And (K238) SRV Control Circuit In Short Runner Valve Assembly Harness Connector
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition off.
- Disconnect the Powertrain Control Module (PCM) C2 harness connector.
- Measure the resistance between ground and the (K238) SRV Control circuit in the SRV harness connector.
Is the resistance less than 100 Ohms?
Yes
- Repair the (K238) Short Runner Valve Control circuit for a short to ground.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
No
- Go To 6
- CHECK THE (K238) SRV CONTROL CIRCUIT FOR AN OPEN OR HIGH RESISTANCE
- Measure the resistance of the (K238) SRV Control circuit between the SRV harness connector and the PCM C2 harness connector.
Is the resistance less than 5.0 Ohms?
Yes
- Go To 7
No
- Repair the (K238) Short Runner Valve Control circuit for an open circuit or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
- Measure the resistance of the (K238) SRV Control circuit between the SRV harness connector and the PCM C2 harness connector.
- CHECK THE (K238) SRV SIGNAL CIRCUIT SHORTED TO VOLTAGE Fig 5: Measuring Voltage Of (K238) SRV Signal Circuit In Short Runner Valve Assembly Harness Connector
Courtesy of CHRYSLER GROUP, LLC
- Turn the ignition on
- Measure the voltage between ground and the (K238) SRV Signal circuit in the Short Runner Valve Assembly harness connector.
Is there any voltage present?
Yes
- Repair the (K238) Short Runner Valve Signal circuit for a short to voltage.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
No
- Go To 8
- POWERTRAIN CONTROL MODULE (PCM)
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Short Runner Valve Assembly and the Powertrain Control Module (PCM).
- Look for any chafed, pierced, pinched or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals.
- Perform any Service Bulletins that may apply.
Were any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
No
- Replace and program the Powertrain Control Module (PCM) in accordance with the Service Information. Refer to MODULE, POWERTRAIN CONTROL, REMOVAL . Refer to PCM/ECM REPROGRAMMING - GAS .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .