LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 929 (Fuel System - 2500 Hd & 3500 Hd) >> Fuel Injection, Gas >> Valve, Short Runner >> Installation >> 6.4L

Valve, Short Runner: Installation: 6.4L

WARNING: This page is about a different car, the 2015 RAM 3500 HD and 2015 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Short Runner Valve Actuator Rubber O-Ring Seal
GC0118917Courtesy of CHRYSLER GROUP, LLC
  1. Install a new short runner valve actuator rubber O-ring seal (1).
    Fig 2: Short Runner Valve Components
    GC0161516Courtesy of CHRYSLER GROUP, LLC
  2. Position the short runner valve (SRV) actuator (2) to the intake manifold. Tighten the retaining bolts (3) to 5 N.m (44 in. lb.).
  3. Install the SRV cover (1).
    Fig 3: Battery
    GC0087848Courtesy of CHRYSLER GROUP, LLC
  4. Connect the negative battery cable (1).