6.4L Y-Pipe
WARNING: This page is about a different car, the 2015 RAM 3500 HD and 2015 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- Position the Y-pipe pipe with proper clearance between the frame (3) and underbody parts. A minimum clearance of 25 mm (1.0 in.) is required.
- Insert the outlet end of the Y-pipe into the extension pipe without tightening the clamp at this time.
- Position the Y-pipe inlets to the manifolds. Install the new bolts (1, 2) and new nuts.
- Hand tighten the nuts while making sure the flange is evenly positioned around the pipe.
- Alternate tightening sequence to further ensure the flange stays even around the pipe. Tighten the bolts (1, 2) to the proper. Refer to SPECIFICATIONS .
- Connect the oxygen sensor electrical connectors.
- Position the extension pipe with proper clearance between the frame and underbody parts and tighten the clamp nuts (4) to the proper. Refer to SPECIFICATIONS .
- Lower the vehicle.
- Start the engine and inspect for exhaust leaks and exhaust system contact with the body panels. Adjust the alignment, if needed. Refer to DIAGNOSIS AND TESTING .