LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 889 (Engine Cooling System - 2500 Hd & 3500 Hd) >> Transmission >> Cooler, Transmission Oil >> Installation >> 6.7L - Diesel

6.7L - Diesel

WARNING: This page is about a different car, the 2015 RAM 3500 HD and 2015 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Transmission Cooler, Cooler Lines & Bolts
GC0157536Courtesy of CHRYSLER GROUP, LLC
  1. Install the transmission oil cooler (2). Tighten bolts (1) to 8 N.m (71 in. lbs.).
  2. Connect the transmission cooler lines (3) and install spring clips.
  3. Install both transmission safety locks.
  4. Connect both negative battery cables.
  5. Start the engine and check all fittings for leaks.
  6. Check the automatic transmission fluid level and fill as necessary.
  7. Install the grille. Refer to GRILLE, INSTALLATION .