LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 795 (8HP45/845RE Automatic Transmission (Service Information) - 1500) >> Valve, 3-Way Coolant >> Installation >> Installation

Valve, 3-Way Coolant: Installation: Installation

WARNING: This page is about a different car, the 2015 RAM 1500. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: 3-Way Coolant Valve Bracket & bolts
GC0154352Courtesy of CHRYSLER GROUP, LLC
  1. Install the three way coolant valve bracket (1) on the right front frame rail.
  2. Install and tighten bolts (2) to 20 N.m (177 in. lbs.).
    Fig 2: Coolant Lines & 3-Way Valve
    GC0154485Courtesy of CHRYSLER GROUP, LLC
  3. Connect the coolant lines (1) to the three way coolant valve (2).
  4. Connect the three way coolant valve wire harness connector.
  5. Fill the cooling system. Refer to STANDARD PROCEDURE .
  6. Connect the negative battery cable.
  7. After the three way coolant valve is replaced, using a scan tool navigate to Misc. Functions and select the Coolant Three Way Valve Replaced selection to clear the Coolant Three Way Valve counter.